Nickel facility restart, Botswana

Nickel facility restart, Botswana

MET63 evaluated complex mineralogy feedstocks for a dormant nickel facility and recommended open-pit recommissioning over surface feedstocks, then was retained to lead the ongoing restart.

Challenge
A dormant nickel facility required more than a technology evaluation. It needed a recommendation that would change the direction of the entire project and determine whether the restart was economically viable at all.

Outcome
MET63’s evaluation of complex mineralogy feedstocks identified open-pit recommissioning as significantly more viable than processing surface feedstocks. That recommendation improved the project’s Net Present Value and produced a technically grounded roadmap for refurbishment and restart. MET63 was retained to lead the restart. The work is ongoing.

MET63 Capabilities Brochure.

Enter your email address to view and download the brochure.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Ultra-Fine Chrome Recovery Plant spec sheet instantly.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Gold Recovery Plant spec sheet instantly.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Chrome Recovery Plant spec sheet instantly.