Large-scale gold processing facility, Eurasia

Large-scale gold processing facility, Eurasia

MET63 led a comprehensive multidisciplinary design review for a 36 Mtpa gold processing facility, establishing a risk-assurance milestone before the capital-intensive detailed design phase.

Challenge
A major gold processing facility operating at 36 million tonnes per annum was approaching the capital-intensive detailed design phase. Before that investment was committed, the client required complete certainty surrounding every risk and every assumption across the entire facility.

Outcome
MET63 led a comprehensive multidisciplinary review covering coordinated analysis of all project data, proactive hazard identification and rigorous oversight of every safety and operational risk. A single defensible risk-assurance milestone allowed the project to proceed with confidence.

MET63 Capabilities Brochure.

Enter your email address to view and download the brochure.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Ultra-Fine Chrome Recovery Plant spec sheet instantly.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Gold Recovery Plant spec sheet instantly.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Chrome Recovery Plant spec sheet instantly.