Large-scale gold processing facility, Eurasia

Large-scale gold processing facility, Eurasia

MET63 led a comprehensive multidisciplinary design review for a 36 Mtpa gold processing facility, establishing a risk-assurance milestone before the capital-intensive detailed design phase.

Challenge
A major gold processing facility operating at 36 million tonnes per annum was approaching the capital-intensive detailed design phase. Before that investment was committed, the client required complete certainty surrounding every risk and every assumption across the entire facility.

Outcome
MET63 led a comprehensive multidisciplinary review covering coordinated analysis of all project data, proactive hazard identification and rigorous oversight of every safety and operational risk. A single defensible risk-assurance milestone allowed the project to proceed with confidence.

Download Spec Sheet

Enter youEnter your email address to download the Pre-Engineered Ultra-Fine Chrome Recovery Plant spec sheet instantly.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Gold Recovery Plant spec sheet instantly.

Download Spec Sheet

Enter your email address to download the Pre-Engineered Chrome Recovery Plant spec sheet instantly.